A 15 kW hybrid solar power plant was installed in the city of Khmelnytsky to operate under a green tariff. The system includes 27 545 W Sola panels, a Sofar HYD 15KTL-3PH three-phase hybrid inverter, a Sofar Solar AMASS GTX3000-BCU BMS battery management unit and four 2.56 kWh SofarSolar AMAS SGTX3000-H batteries with a total capacity of 10.24 kWh. The station provides generation with the possibility of selling excess energy to the grid and autonomous support for the facility.