A 5 kW hybrid solar power plant was installed in the city of Chernivtsi on the territory of a children’s health summer camp. The system consists of 12 410 W Risen solar panels, a 5 kW Must Pro hybrid inverter and two 2.4 kWh Pylontech batteries. The station provides reliable and uninterrupted power supply to the facility with the possibility of autonomous operation.
For business
5 kW hybrid station in Chernivtsi for a children’s camp
Chernivetska
| Station type | Hybrid |
|---|---|
| Object type | For business |
| Business type | Hospitals and educational institutions |
| System power | Up to 10 kW |
| Region | Chernivetska |
Features.
| Station type | Hybrid |
|---|---|
| Object type | For business |
| Business type | Hospitals and educational institutions |
| System power | Up to 10 kW |
| Region | Chernivetska |