A 5 kW hybrid solar power plant was installed in the city of Khmelnytskyi to provide power to its own office. The system includes 9 JA Solar 405 W solar panels, a 5 kW Must inverter, and a 5 kWh Pylontech battery. The station ensures uninterrupted operation of the office and reduces dependence on mains power.