A 9 kW grid-tied solar power plant was installed in the village of Kriachky, Kyiv region (Vasylkiv district) for self-consumption. The system includes an aluminum structure with 3 kW of non-standard mounts on the facade of the house and 6 kW on the pitched roof. The system is equipped with 16 Ja Solar JAM72D30 550 W panels. To ensure the system’s operation, a 12 kW Deye hybrid inverter is installed to optimize the power supply for own needs.