A 3.2-kW hybrid solar power plant was installed in Khmelnytskyi. The system consists of 8 Risen 410 W solar panels, an 8 kW Deye hybrid inverter, and a 5 kWh Pylontech battery. The station provides efficient power supply with the possibility of autonomous operation and backup power, and has the potential for further expansion.