The project envisages the installation of a 15 kW hybrid solar power plant in a three-phase grid, including the necessary equipment to ensure uninterrupted operation. AC/DC protection was installed for optimal system operation, and high-quality LAPP solar cables with a total length of 300 meters were used to connect the panels. PVS 56 wire (30 m) was used to connect the components and PV-3 ngd 110 wire (20 m) was used to connect the inverter and battery system.
For reliable connection of the system elements, CHYT MS-4 connectors (8 pcs.) are used, which provide stable and safe contact. The profile system (24 pcs.) provides convenient mounting of solar panels, guaranteeing the stability of the structure even in extreme weather conditions. This set of equipment is optimally suited for the implementation of an efficient hybrid solar power plant with the ability to accumulate energy and provide autonomous power supply.