A 42 kW grid-connected solar power plant has been installed in the town of Derazhnia, Khmelnytskyi Oblast. The system is connected to the grid and operates under the Green Tariff program, which ensures a stable power supply for the facility and the opportunity to generate income from the sale of surplus energy.
For home
A 42-kW grid-connected power station in the town of Derazhnya under the green tariff program
Khmelnytska
| Station type | Network |
|---|---|
| Object type | For home |
| System power | 10-50 kW |
| Services | Connection to the green tariff |
| Region | Khmelnytska |
Features.
| Station type | Network |
|---|---|
| Object type | For home |
| System power | 10-50 kW |
| Services | Connection to the green tariff |
| Region | Khmelnytska |