Our projects
Khmelnytska
1 MW
1 MW grid station in Volochysk for TAD production
Savings for the year: 11247000 UAH
Odeska
550 kW
A 550 kW grid station in Belgorod-Dnistrovsky for the Belsta shoe factory
Savings for the year: 6185850 UAH
Kyivska
200 kW
A 200-kW power station in the village of Hlyavakha for “BIRZHA-SERVICE” LLC
Savings for the year: 2249400 UAH
Khmelnytska
200 kW
200 kW grid station in Khmelnytsky for Proskuriv-Agro LLC
Savings for the year: 2249400 UAH
Khmelnytska
200 kW
A 200 kW grid station in Krasilov for the Mamyn Khlib enterprise
Savings for the year: 2249400 UAH
Kyivska
184 kW
184 kW grid station in Tarasivka village for BETON-ML
Savings for the year: 2069450 UAH
Chernivetska
176 kW
176 kW grid-tied SPP + 800 kW commercial AELIO energy storage system in Chahor village
Savings for the year: 224940 UAH
Khmelnytska
120 kW
120 kW grid station in the village of Stufchyntsi for Green House LLC
Savings for the year: 1349640 UAH
Khmelnytska
100 kW
A 100-kW grid-connected power station in the village of Karpivtsi for MASTER-KORN, LLC
Savings for the year: 1124700 UAH